Case Studies
Integrated Solar-Storage-Charging Project at a Logistics Park in Jakarta, Indonesia
An LVK 522kWh energy storage cabinet paired with carport rooftop solar and DC fast-charging piles at a Jakarta logistics park, featuring a 250kW STS module for millisecond-level grid-to-island transitions.
Project Overview
Project Background
Customer Needs
As the park fully adopted electric trucks, simultaneous high-power fast charging by multiple vehicles caused severe instantaneous power surges, leading to frequent transformer overloads and tripping. Furthermore, due to local grid transmission capacity limits, the utility company rejected the park's application for a capacity upgrade.
Application Focus
EV Charging Hub
Solution Design
Integrated ESS Design For Site Operations

System Architecture
Coordinated Power Flow
522 kWh BESS + 250 kW STS + Carport PV + DC Fast Chargers

Results & Benefits
Project Outcomes
Green charging costs for the logistics fleet were reduced by 45%.
Achieved "virtual capacity expansion," eliminating the need for the massive investment and lengthy approval processes associated with applying to the utility for a grid capacity upgrade.
The estimated payback period (ROI) is 3.1 years.